CEB | Existing Customer

Download Applications & Guidelines



1. Application for Obtaining a New Electricity Supply / Augmentation of Supply / Obtaining a Temporary Service Connection

  • 1.1. Application for Obtaining a New Electricity Supply / Augmentation of Supply / Obtaining a Temporary Service Connection

  • 1.2. Annex I: Guidelines to Obtain a New Service Connection.

  • 1.3. Annex II: Obtaining right of way.

  • 1.4. Annex III: Fixing the Meter on the Boundary Wall or Near the Gate.

  • 1.5. Annex IV & V: Standard Arrangement for Connecting a New Service Connection.

  • 1.6. Annex VI: Standard Agreement for Service Connections.

2. Application for Tariff Change

3. Application for Testing the Accuracy of Energy Meter

4. Application for Services on Electricity Network

  • 4.1. Application for Services on Electricity Network

  • 4.2. Annex I: Guidelines on shifting of the Electricity Meters in consumers premise's.

  • 4.3. Annex II: Guidelines on removing/ shifting of electrical poles/ lines.

5. Application to change Rooftop Solar Scheme/Flat to Variable Tariff (RTSPV)

6. Application for Change of Name of the Electricity Account

  • 6.1. Application for Change of Name of the Electricity Account

  • 6.2. Annxure I: The Guidelines to change the Name of the Account (Change of Tariff Customer)