Supporting Electricity Supply Reliability Improvement Project Package 7

Name of the project Technical Description Total Estimated Cost (US$) Project Period Funding Agency Present Status
Lot A 1 Construction of 132 kV 100 Mvar Breaker Switch Capacitors at Pannipitiya GS 6.7 Million 2019-2024 Asian Development Bank (ADB) Completed and in Operation from December 2024
Lot A2 Installation of Static Var System (SVS) at Biyagama Grid Substation 9.7 Million. 2020-2024 Asian Development Bank (ADB) Completed and in Operation from April 2024

The expected output of the project is to improve reactive power management in the transmission system and it includes installation of (a) 100 megavolt-ampere reactive breaker-switched capacitors at the 132 kV bus bar of the existing Pannipitiya grid substation; (b) +100/–100 megavolt-ampere reactive static var compensator at the 220 kV bus bar of the existing Biyagama grid substation for voltage control during dynamic conditions.

Lot A1 - Installation of 100MVAr Breaker Switched Capacitor (BSC) at Pannipitiya Grid Substation: The contract for Lot A1 was signed with Siemens Ltd., India on May 09, 2019 (Contract value of $6.7 Million). The installations are completed, and the capacitor banks are energized and in operation from December 2024.

BSC-1

Lot A2 - Static Var Compensator (SVC) at Biyagama Grid Substation: The contract for Lot A2 was signed with Hyosung Heavy Industries Corporation, Korea on July 07, 2020 (Contract value of $9.7 Million). The project is fully completed and energized. The SVC system is in operation from April, 2024.

Statcom-1
Statcom

Further Reading: https://www.adb.org/projects/49216-002/main | Asian Development Bank (ADB)*